Trouver Tuile, Bâtiment Préfabriqué, Ardoise dans le répertoire Industry, Reliable Fabricant / Fournisseur / Factory de Chine

Panier (0)

Les dernières alertes produit

Excellents carreaux principaux de roche de résistance à la corrosion pour des toits d'ardoise

Informations de base

Modèle: 1050

Description du produit

Excellentes tuiles de toiture en résine synthétique à haute résistance à la corrosion \ n \ n Caractéristiques: \ n \ n
Decorative look: it combines new innovative style with Chinese antique elements, offering a fantastic decorative look to the roofs
Excellent color stability and long life span: at least 10 years no color fading even under harsh weather condition such as strong UV radiation. Its life span is up to 30 years.
Good load carrying ability: no crack or damage happen when 150kgs is loaded with supporting distance of 660mm
Impact resistance: no crack or damage occur after a steel ball of 1kg drop from 3 meters high
Corrosion resistance: free from various chemical substances such as acid, alkali, salt
Fire resistance: the fireproof performance is ≥ B2, belonging to non-flammable building material
Environmently friendly: Hongke products do not contain asbestos and any radioactive element , can be recycled
Good sound insulation: have good sound absorption of noise effect such as rain, wind and even hail,30db lower than color steel tile
Self-cleaning performance: it do not absorb dust and would be clean as new after rain
Easy and convenient installation: with light weight that increase the installation efficiency, easy fitting and transportation thus save cost
\ n \ n Installation: \ n \ n
a. Purlin can be square tube (60x40x3mm)or C steel (100x50xx20x3mm) or anti-corrosion wood (60x40mm).
b. The space between purlins is 660mm and the purlin are arranged from bottom to top.
c. Refer to the local wind direction, and install the main roof tiles in the reverse wind direction, overlap one wave, and do it on both sides at the same time.
d. Installation of main ridge: Cut a part of the first main ridge before installing.
e. The lap-joint places between the main ridge and diagonal ridge should be sawed to be smooth, after finishing installation of main ridge and diagonal ridge, and then to install three-way ridge.
f. When fixing, drill a hole first by electric drill, the aperture is 2mm bigger than hook screws. It is recommended to choose 6.3mm self-tapping screws and our special waterproof accessories.
\ n \ n

Groupes de Produits : Tuile